Sikalastic®-530 Thermic AP is a 1-part, acrylic, water based, elastic, cold applied liquid membrane that can be applied directly from the container. It contains addition of polymeric microsphers that creates a layer of insulation that minimises surface temperature of the membrane and therefore increases thermal efficiency of the building. The Product provides a seamless, smooth waterproof finish which is resistant to UV exposure and has elastic properties.
- Minimises the surface temperature on roof and walls
- Reduces energy for cooling of buildings
- High adhesion to concrete, render and masonry
- Low VOC content
- Resistant to permanent UV exposure
- Good resistance to mould and fungus
- Cold applied - requires no heat or flame
- Applied by brush or roller
Usage
The Product is used for:- Flat and sloping fully exposed roof structures
- New construction and refurbishment projects
- Waterproofing and renovation of old roof tiles
- Waterproofing of external walls
- Roofs with numerous details such as penetrations, drains, roof lights and complex geometry
- Concrete and cementitious substrates
- Brick
- Unglazed clay tiles
- Unglazed ceramic tiles
- Metal roof
Advantages
- Minimises the surface temperature on roof and walls
- Reduces energy for cooling of buildings
- High adhesion to concrete, render and masonry
- Low VOC content
- Resistant to permanent UV exposure
- Good resistance to mould and fungus
- Cold applied - requires no heat or flame
- Applied by brush or roller
Packaging
20 L containers
Refer to the current price list for available packaging variations.
Product Details
APPROVALS / STANDARDS
Certified Singapore Green Building Product - SGBC
Green Marks 4 Ticks: Leader
Chemical Base
Acrylic
Shelf Life
12 months from date of production
Storage Conditions
The Product must be stored in original, unopened and undamaged sealed packaging in dry conditions at temperatures between +5 °C and +30 °C. Always refer to packaging.
Refer to the current Safety Data Sheet for information on safe handling and storage.
Density
(1.20 ± 0.05) kg/L (at +23ο C) | (EN ISO 2811-1) |
Solid content by weight
(60 ± 3) %
Solid content by volume
(50 ± 3) %
System Structure
ROOF COATING:
Layer | Product | Consumption |
Primer* | Davco Acrylic Primer | ~0.1 – 0.2 L/m2 |
First Coat | Sikalastic®-530 Thermic AP | ~0.9 L/m2 |
Second Coat | Sikalastic®-530 Thermic AP | ~0.9 L/m2 |
REINFORCED ROOF WATERPROOFING:
Layer | Product | Consumption |
Primer* | Davco Acrylic Primer | ~0.1 – 0.2 L/m2 |
First Coat | Sikalastic®-530 Thermic AP | ~1.2 L/m2 |
Reinforcement | Davco Sovamesh | Per m2 |
Second Coat | Sikalastic®-530 Thermic AP | ~0.45 L/m2 |
Third Coat | Sikalastic®-530 Thermic AP | ~0.45 L/m2 |
Primer* : For metal substrate, use Davco Primer XP or Davco/Sika recommended primer.
Note: Consumption data is theoretical and does not allow for any additional material due to surface porosity, surface profile, variations in level, wastage or any other variations. Apply product to a test area to calculate the exact consumption for the specific substrate conditions and proposed application equipment.
Tensile Strength
2 N/mm2 | (ASTM D412) |
Crack Bridging Ability
Unreinforced | No crack at 2 mm crack width |
Unreinforced | No crack after 10 cycles of opening and closing to 1 mm crack width |
Thermal Conductivity
0.045 W/m.K
Application
Product Temperature
Maximum | +40 οC |
Minimum | +5 οC |
Ambient Air Temperature
Maximum | +40 οC |
Minimum | +5 οC |
Relative Air Humidity
80 % maximum
Dew Point
Beware of condensation. The substrate and uncured applied roof material must be at least +3 °C above dew point to reduce the risk of condensation on the surface finish.
Substrate Temperature
Maximum | +40 οC |
Minimum | +5 οC |
Substrate Moisture Content
Substrate | Test method | Moisture content |
Cementitious substrates | Sika® Tramex moisture metre | ≤ 6 % |
Cementitious substrates | Calcium carbide method (CM-method) | ≤ 4 % |
No rising moisture (ASTM D4263, polyethylene sheet)
The substrate must be visibly dry with no standing moisture.
Waiting Time / Overcoating
4 – 6 hours
Note: Times are approximate and will be affected by changing ambient conditions, particularly temperature and relative humidity.
EQUIPMENT
Select the most appropriate equipment required for the project:
SUBSTRATE PREPARATION EQUIPMENT
-
Abrasive blast cleaning / planing / scarifying or grinding equipment.
-
Manual or mechanical wire brushes.
-
High pressure power washer.
For other types of preparation equipment, contact Sika Technical Services.
MIXING EQUIPMENT
-
Electric single or double paddle mixer (300–400 rpm) with spiral paddle
APPLICATION EQUIPMENT
-
Brush: Soft bristle
-
Roller: Solvent resistant fleece
SUBSTRATE PREPARATION
IMPORTANT
System design
Consider the following when designing the system:
- The supporting structure must be of sufficient structural strength to support all new and existing layers of the system build-up.
- If used as a roof system, the complete system must be designed to withstand and be secured against wind uplift loadings.
- Reinforcement (partial or total) must be used over dynamic cracks and joints.
GENERAL
Substrates must be free of standing water (no puddles) clean and free of all contaminants such as dirt, oil, grease, coatings, laitance, surface treatments and loose friable material.
All dust, loose and friable material must be completely removed from all surfaces before application of the product, and associated system products, by industrial vacuuming equipment.
To confirm adequate surface preparation and product adhesion, carry out a trial before full application together with adhesion tests.
CEMENTITIOUS SUBSTRATES
- Substrate must be sound with a minimum tensile adhesion strength of 1.5 N/mm2, clean, dry and free of all contaminants such as dirt, oil, grease, coatings, laitance, surface treatments and loose friable material.
- New concrete must be cured for at least 28 days and have a tensile strength > 1.5 N/mm2.
- Cementitious substrates must be prepared mechanically using substrate preparation equipment to remove cement laitance and achieve an open textured gripping surface profile suitable for the product thickness.
- High spots can be removed by grinding.
- Weak cementitious substrates must be removed and surface defects such as blow holes and voids must be fully exposed.
- Repairs to the substrate, filling of joints, blowholes / voids and surface levelling must be carried out using appropriate products from the Sikafloor®, Sikadur® and Sikagard® range of materials. Products must be cured before application of the waterproofing system.
BRICK AND STONE
- Mortar joints must be sound and flush pointed.
- Replace loose bricks, stone and mortar.
- Thoroughly clean the surface by power washing and allow to dry.
UNGLAZED CERAMIC TILES
- Ensure all tiles are securely fixed.
- Replace any broken, loose or missing sections.
- Thoroughly clean the surface by power washing and allow to dry.
CLAY TILES
- Ensure all tiles are securely fixed.
- Replace any broken, loose or missing sections.
- Thoroughly clean the surface by power washing and allow to dry.
MIXING
IMPORTANT
Avoid over-mixing to minimise air entrainment.
Product is supplied ready to use. Before application, mix for at least 1 minute or until the liquid is uniform.
APPLICATION
IMPORTANT
Protect from rain
After application, the product must be protected from heavy rain or rain showers until dry to prevent surface damage.
Application of successive coats
To prevent a reduction in product performance the following actions are necessary when applying successive coats.
- Ensure product is totally dry and the surface is without pinholes before applying successive coats.
- Remove surface water between coating applications.
- Confirm overcoating times have been achieved between coating applications.
No application on rising moisture
Do not apply on substrates with rising moisture.
INSTALLATION PROCEDURE
Reference must be made to further documentation where applicable, such as a relevant method statement, application manual and installation or working instructions.
PRIMER
Equipment:
-
Fleece roller
-
Brush
- Pour the mixed Product onto the surface. The consumption is specified in the individual primer product data sheet Application Information.
- Apply the Product evenly over the surface with a brush or fleece roller.
- Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
ROOF COATING
Equipment:
-
Fleece roller
-
Brush
First coat
- Install the detailing first (such as corners, upstands, joints) before installation of the main horizontal surfaces.
- Pour the mixed Product onto the substrate. The consumption is specified in Application Information.
- Apply the Product with either a rush or a fleece roller.
- IMPORTANT Avoid going back to re-work areas that are partially dried as this may damage the surface finish. Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
Second coat
- Install the detailing first (such as corners, upstands, joints) before installation of the main horizontal surfaces.
- Pour the mixed Product onto the substrate. The consumption is specified in Application Information.
- Apply the Product perpendicularly with either a brush or a fleece roller .
- IMPORTANT Avoid going back to re-work areas that are partially dried as this may damage the surface finish. Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
ROOF WATERPROOFING
Reinforced waterproof membrane
Equipment:
-
Fleece roller
-
Brush
First coat
- Install the detailing first (such as corners, upstands, joints) before installation of the main horizontal surfaces.
- Pour the mixed Product onto the substrate. The consumption is specified in Application Information.
- Apply the Product with either a brush or a fleece roller.
- IMPORTANT Avoid going back to re-work areas that are partially dried as this may damage the surface finish. Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
Reinforcement application
- For the best results work 1.0 m at a time lengthways applying the 1st coat and embedding the reinforcement.
- Make sure reinforcement overlaps are minimum 50 mm.
- Lay the reinforcement onto the wet 1st coat
- Use a short pile roller to roll over the reinforcement and resin
The coating is continuous and pore free.
Second coat
- Check if the reinforcement is embeded properly, if necessary use sand paper to unsure that the surface is even. If the surface was contaminated with dust or dirt clean the surface with water and light detergent, wait until the surface is dry before applying 2nd coat. Remove any standing water before application.
- Install the detailing first (such as corners, upstands, joints) before installation of the main horizontal surfaces.
- Pour the mixed Product onto the substrate. The consumption is specified in Application Information.
- Apply the Product perpendicularly with one either a brush or a fleece roller.
- IMPORTANT Avoid going back to re-work areas that are partially dried as this may damage the surface finish. Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
Third coat
- Install the detailing first (such as corners, upstands, joints) before installation of the main horizontal surfaces.
- Pour the mixed Product onto the substrate. The consumption is specified in Application Information.
- Apply the Product perpendicularly with one either a brush or a fleece roller.
- IMPORTANT Avoid going back to re-work areas that are partially dried as this may damage the surface finish. Back roll the surface in two directions at right angles with a fleece roller.
The coating is continuous and pore free.
CLEANING OF TOOLS